Senarai Kursus
Memaparkan 1-20 daripada 35 items.
# | Nama Kursus | Jumlah Hari Bekerja | Penerangan Kursus |
---|---|---|---|
1 | PEMBUATAN PASTRI T2 KHAS | 170 | |
2 | OPERASI PEMBUATAN PERABOT T2 KHAS | 170 | |
3 | JAHITAN PAKAIAN LELAKI T2 KHAS | 170 | Merujuk kepada JPKSWK 600-2/1/18 (8) |
4 | PENGELUARAN FABRIKASI - SME T2 KHAS | 170 | Merujuk kepada rujukan JPKSWK600-2/1/18(8) |
5 | OPERASI PEMBUATAN PERABOT T2 KHAS | 170 | MERUJUK KEPADA JPKSWK600-2/1/18 ( 16) |
6 | PEMBUATAN PASTRI T2 KHAS | 170 | Merujuk kepada JPKSWK600-2/1/18 |
7 | TUKANG LEPA T1 KHAS | 125 | TUKANG LEPA 2020 |
8 | JAHITAN PAKAIAN LELAKI C141-001-2:2017 T2 KHAS | 85 | JPK.SWK 600-2/1/18(19) |
9 | PENGELUARAN FABRIKASI - SME C259-002:2016 T2 KHAS | 85 | JPK.SWK 600-2/1/18(19) |
10 | PEMBUATAN PASTRI | 180 | CU1 SAFETY,HEALTH AND HYGIEBE (60 JAM) CU2 BATTER AND DOUGH PREPARATION (60JAM) CU3 FILLING AND CREAM PREPARATION (60JAM) CU4 PUDDING PREPARATION (60JAM) CU5 COOKIES PREPARATION (60JAM) CU6 MALAYSIA DESSERT AND KUIH PREPARATION (90JAM) CU7 CAKES PREPARATION (132 JAM) CU8 PASTRY PRODUCT AND MATERIALS HANDLING (30JAM) |
11 | OPERASI PEMBUATAN PERABOT | 180 | CU1 FURNITURE MATERIALS PREPARATION (60 JAM) CU2 SOLID WOOD LAMINATION (60 JAM) CU3 FURNITURE COMPONENTS PREPARATION (60 JAM) CU4 FURITURE COMPONENTS ASSEMBLY (120 JAM) CU5 FURNITURE FINISHING (120 JAM) CU6 LOOSE FURNITURE PRODUCTION (90 JAM) |
12 | PENGELUARAN FABRIKASI | 180 | CU1 CUTTING WORK (180 JAM) CU2 FORMING WORKS (180 JAM) CU3 ASSEMBLY WORKS (378 JAM) CU4 FINISHING WORKS (90 JAM) CU5 FINAL PRODUCT INSTALLATION (72 JAM) |
13 | JAHITAN PAKAIAN LELAKI | 180 | CU1 CASUAL WEAR MAKING (120 JAM) CU2 OFFICE WEAR MAKING (120 JAM) CU3 TRADITIONAL WEAR MAKING (120 JAM) CU4 TRADITIONAL CONTEMPORAY WEAR MAKING (120 JAM) CU5 ACTIVE WEAR MAKING (120 JAM) CU6 FUNCTIONAL WEAR MAKING (120 JAM) |
14 | OPERASI PEMBUATAN PERABOT | 80 | CU 02 SOLID WOOD LAMINATION CU 03 FURNITURE COMPONENTS PREPARATION CU 04 FURNITURE COMPONENTS ASSEMBLY CU 5 FURNITURE FINISHING CU 6 LOOSE FURNITURE PRODUCTION |
15 | PENGELUARAN FABRIKASI | 80 | CU 01 CUTTING WORK CU 02 FORMING WORKS CU 03 ASSEMBLY WORKS |
16 | JAHITAN PAKAIAN LELAKI | 80 | CU 01 CASUAL WEAR MAKING CU 02 OFFICE WEAR MAKING CU 03 TRADITIONAL WEAR MAKING CU 04 TRADITIONAL CONTEMPORARY WEAR MAKING CU 05 ACTIVE WEAR MAKING |
17 | OPERASI PEMBUATAN PERABOT | 80 | CU 03 FURNITURE COMPONENTS PREPARATION CU 04 FURNITURE COMPONENTS ASSEMBLY CU 05 FURNITURE FINISHING CU 06 LOOSE FURNITURE PRODUCTION |
18 | PENGELUARAN FABRIKASI | 80 | CU 02 FORMING WORKS CU 03 ASSEMBLY WORKS CU 04 FINISHING WORKS |
19 | JAHITAN PAKAIAN LELAKI | 80 | CU 01 CASUAL WEAR MAKING CU 02 OFFICE WEAR MAKING CU 03 TRADITIONAL WEAR MAKING CU 04 TRADITIONAL CONTEMPORARY WEAR MAKING |
20 | PENGELUARAN FABRIKASI | 80 | CU 02 FORMING WORKS CU 03 ASSEMBLY WORKS CU 05 FINAL PRODUCT INSTALLATION |