Job Description (JD)
Nama Program | Operasi Penggerudian(Minyak, Gas & Petrokimia) [OG-012-3:2011] |
---|---|
Kod CU | OG-012-3:2011-C06 |
Competency | Core |
Tajuk CU | XMAS TREE INSTALLATION |
Penerangan CU | Xmas Tree Installation is a process to install control valves, pressure gauges, and chokes assembled at the top of a well to control the flow of oil and gas after the well has been drilled and completed. |
Tempoh Latihan | 192 |
Objektif Pembelajaran | 0 |
Pra-Syarat | 0 |