Job Description (JD)
Nama Program | Operasi Penggerudian(Minyak, Gas & Petrokimia) [OG-012-3:2011] |
---|---|
Kod CU | OG-012-3:2011-C07 |
Competency | Core |
Tajuk CU | RACK BACK DRILL PIPE HANDLIN |
Penerangan CU | Rack back drill pipe handling is a process to place a stand of drill pipe in the derrick when coming out of the hole on a trip. |
Tempoh Latihan | 244 |
Objektif Pembelajaran | 0 |
Pra-Syarat | 0 |