Nama Program | FABRIKASI, PEMASANGAN & PENGUJIAN PERPAIPAN [TP-029-2:2014] |
Kod CU | TP-029-2:2014-C01 |
Competency | Core |
Tajuk CU | PIPE FABRICATION |
Penerangan CU | Pipe fabrication is carried out to meet the various piping systems requirements on board. Normally pipe fabrication is carried out on board or in the workshop. The person who is competent in pipe fabrication shall be able to prepare pipe fabrication requirements, carry out pipe fabrication and finalise pipe fabrication. The outcome of this competency is to fabricate pipes as per shop drawings and according to Classification Society requirements or international standards.
|
Tempoh Latihan | 200 |
Objektif Pembelajaran | The outcome of this competency is to ensure that the fabrication of pipes is as per shop drawings and according to Classification Society requirements or international standards. Upon completion of this competency unit, trainees will be able to: Prepare pipe fabrication requirements Carry out pipe fabrication activities Finalise pipe fabrication |
Pra-Syarat | 0 |
---|