Nama Program | FABRIKASI, PEMASANGAN & PENGUJIAN PERPAIPAN [TP-029-2:2014] |
Kod CU | TP-029-2:2014-C02 |
Competency | Core |
Tajuk CU | PIPING INSTALLATION |
Penerangan CU | Piping installation is completed before system testing on board. It involves the installation of piping spools and piping systems. The person who is competent in piping installation shall be able to prepare piping installation work requirements, carry out installation of fabricated pipe spools and finalise piping installation. The outcome of this competency is to complete the piping system installation according to technical drawings and technical specifications required.
|
Tempoh Latihan | 100 |
Objektif Pembelajaran | The outcome of this competency is to ensure that the piping installation is according to technical drawings and technical specifications required. Upon completion of this competency unit, trainees will be able to: Prepare piping installation work requirements Carry out installation of fabricated pipe spools Finalise piping installation |
Pra-Syarat | 0 |
---|