Job Description (JD)
Nama Program | Pull Production Operation [TP-322-3:2012] |
---|---|
Kod CU | TP-322-3:2012-C05 |
Competency | Core |
Tajuk CU | DESIGN MATERIAL HANDLER (MH) SYSTEM |
Penerangan CU | This Competency Unit title describes the competency in Material Handler(MH) System. He / She is able to designing, implementing and confirming the material movement in the factoryto avoid operation down time.. The person who is competent in this CU shall be able to analyze Part Supply Route, Timing for supply parts, Type of packaging, quantity of supply parts and create MH Standardized Work according to analyzed items. The outcomes of this CU are material handlingsystem in the factory will be running smoothly as per production planning. |
Tempoh Latihan | 224 |
Objektif Pembelajaran | The person who is competent in this CU shall be able toidentify, follow and retrieve product in the material handler system according to the documented items. Upon completion of this competency unit trainees will be able to:- Perform Part Supply Route Analyse Timing for supply parts Analyse Quantity of supply parts Create MH Standardized Work |
Pra-Syarat | 0 |