Job Description (JD)
Nama Program | Pull Production Operation [TP-322-3:2012] |
---|---|
Kod CU | TP-322-3:2012-E01 |
Competency | Elektif |
Tajuk CU | PULL PRODUCTION SYSTEM TOOL FABRICATION |
Penerangan CU | This Competency Unit title describes the competency in Internal Pull Production(Kanban) System Tools fabrication He / She isresponsible to designing, producing, revising and confirming the LPS tools for related area to make the LPS system running smoothly.. The person who is competent in this CU shall be able to perform Pull Production System Tool Fabrication at Raw Material,Process andFinished Goods (FG) areaaccording to Pull Production system tools design. The outcomes of this CU are LPS tools are prepare for the guidance of LPS system implementation. |
Tempoh Latihan | 240 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to design and fabricate Pull Production Tool Fabrication according to Standard Operation Procedure and company rules. Upon completion of this competency unit trainees will be able to:- Perform Pull Production Tool Fabrication at Raw Material area. Perform Pull Production Tool Fabrication at Process area. Perform Pull Production Tool Fabrication at Finished Goods (FG) area. |
Pra-Syarat | 0 |