Job Description (JD)
Nama Program | Operasi Loji Janakuasa Kitar Padu/Arang Batu [EE-214-3:2016] |
---|---|
Kod CU | EE-214-3:2016-C02 |
Competency | Core |
Tajuk CU | POWER PLANT EQUIPMENT FUNCTIONAL TEST |
Penerangan CU | Power plant equipment functional test is to check functionalities of the plant equipment as specified in the OEM manual to ensure the readiness of the equipment. It includes checking of feed power or temporary power for start-up testing, HRSG and DCS loop checks, combustion turbines and steam turbine, synchronization of the generators and load testing The person who is competent in power plant equipment functional test shall be able to prepare plant equipment functional test requirement, setup functional test requirement, perform plant functional test and report equipment functionality result The outcome of this competency unit will enable the power plant equipment functional test is carried out safely for plant equipment readiness |
Tempoh Latihan | 160 |
Objektif Pembelajaran | The person who is competent in this competency unit shall be able to enable the power plant equipment functional test is carried out safely for plant equipment readiness. Upon completion of this competency unit, trainees will be able to:- • Prepare plant equipment functional test requirement • Setup functionality test requirement • Perform plant functionality test • Report equipment functionality result |
Pra-Syarat | 0 |