Job Description (JD)
Nama Program | Operasi Loji Janakuasa Kitar Padu/Arang Batu [EE-214-3:2016] |
---|---|
Kod CU | EE-214-3:2016-E05 |
Competency | Elektif |
Tajuk CU | COAL-FIRED POWER PLANT SYSTEM SHUT-DOWN |
Penerangan CU | Coal-fired power plant system start-up is a functional roles and responsibility to performing coal-fired power plant shutdown activities according to system requirement. The coal-fired power system shall be shutdown to coal-fired power plant shutdown procedures. The person who is competent in coal-fired power plant system shutdown shall be able to prepare coal-fired power plant shut-down, perform power unit shutdown activities, plant auxiliary system shutdown activities and BOP shutdown activities The outcome of competency unit shall enable power plant system is safety shutdown according to coal-fired power plant shutdown instruction |
Tempoh Latihan | 240 |
Objektif Pembelajaran | The person who is competent in this competency unit shall be able to enable power plant system is safety shutdown according to coal-fired power plant shutdown instruction. Upon completion of this competency unit, trainees will be able to:- • Prepare coal-fired power plant shutdown • Perform power plant shutdown activities • Perform plant auxiliary system shutdown activities • Perform BOP shutdown activities |
Pra-Syarat | 0 |