JOB DESCRIPTION

Job Description (JD)

Nama ProgramPEMASANGAN KACA DAN ALUMINIUM BANGUNAN [F433-001-2:2017]
Kod CUF433-001-2:2017-C01
CompetencyCore
Tajuk CUPARTITION WALL INSTALLATION
Penerangan CUPartition Wall Installation describe the competency in the installation of metal studs frame to the floor, ceiling and wall, which is then covered with plasterboard.

A competent person in this CU shall be able to prepare partition wall installation requirement, carry out main frame installation, perform panel board installation, carry out door leaf installation, carry out window installation, and carry out aluminium finishing installation.

The outcome of this competency will enable the personnel to identify, assembled and install wall partition members, and explain layout and installation procedure for these member in building construction according to standard operating procedure, and waste management requirements.

To perform the CU, the competency owner is required to be physically fit.
Tempoh Latihan220
Objektif PembelajaranThe outcome of this competency will enable the personnel to identify, assembled and install wall partition members, and explain layout and installation procedure for these member in building construction according to standard operating procedure, and waste management requirements. Upon completion of this competency unit, trainees will be able to:-
1. Prepare partition wall installation requirement
2. Carry out main frame installation
3. Perform panel board installation
4. Carry out door leaf installation
5. Carry out window installation
6. Carry out aluminium finishing installation
Pra-Syarat0