Job Description (JD)
Nama Program | PEMASANGAN KACA DAN ALUMINIUM BANGUNAN [F433-001-2:2017] |
---|---|
Kod CU | F433-001-2:2017-C03 |
Competency | Core |
Tajuk CU | CASEMENT AND TOP HUNG WINDOWS INSTALLATION |
Penerangan CU | Casement and Top Hung Windows Installation competency describes the installation of a casement window which is attached to its frame by one or more hinges at the side, and aluminium top hung windows sash hinge on the top of the main frame, thereby allowing windows to swing out secured by high quality steel friction stays. A competent person in this CU shall be able to Prepare casement and top hung windows installation requirements, Carry out Aluminium main frame Assembly, Execute main frame to wall opening, Carry out Aluminium Inner frame Assembly, conduct glass cutting, carry out Aluminium inner frame and glass assembly, and perform inner frame installation to the main frame The outcome of this competency will enable the personnel to identify, assembled and install Casement and Top Hung Windows members, and explain layout and installation procedure for these member in building construction according to standard operating procedure, and waste management requirements. To perform the CU, the competency owner is required to be physically fit |
Tempoh Latihan | 260 |
Objektif Pembelajaran | The outcome of this competency will enable the personnel to identify, assembled and install Casement and Top Hung Windows members, and explain layout and installation procedure for these member in building construction according to standard operating procedure, and waste management requirements. Upon completion of this competency unit, trainees will be able to:- 1.Prepare casement and top hung windows installation requirement, 2.Carry out aluminium main frame assembly, 3.Execute main frame to wall opening, 4.Carry out aluminium inner frame assembly, 5.Conduct glass cutting, 6.Carry out aluminium inner frame and glass assembly, 7.Perform inner frame installation to the main frame |
Pra-Syarat | 0 |