Job Description (JD)
Nama Program | Lukisan Pelan Awam dan Struktur [M711-002-2:2017] |
---|---|
Kod CU | M711-002-2:2017-C04 |
Competency | Core |
Tajuk CU | SEWERAGE SYSTEM DRAWING |
Penerangan CU | Sewerage system drawing describes the competency in producing sewerage system drawing that meet client’s requirements and authority’s requirements A competent person in this CU shall be able to carry out sewerage system initial sketching, perform sewerage drawing application menu setting, carry out sewerage system drawing , inspect sewerage system drawing, present sewerage system drawing for superior approval and carry out sewerage system drawing printing The outcome of this competency is to produce sewerage drawing in accordance with design specification and authority requirements To perform the CU, the competency owner is required to complete the drawing within stipulated time The personnel who aspires to be competent in this competency must in prior have the following competencies:- i. Good visualization ii. Good listening and communication skill |
Tempoh Latihan | 170 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to produce sewerage system drawing that meet design and authority requirements. Upon completion of this competency units, trainees will be able to:- 1. Carry out sewerage initial sketching 2. Perform sewerage drawing application menu setting 3. Carry out sewerage system drawing 4. Inspect sewerage system drawing details 5. Present sewerage system drawing for superior approval 6. Carry out sewerage system drawing printing / plotting |
Pra-Syarat | 0 |