Job Description (JD)
Nama Program | Pengeluaran Fabrikasi - SME [C259-002-2:2016] |
---|---|
Kod CU | C259-002-2:2016-C05 |
Competency | Core |
Tajuk CU | FINAL PRODUCT INSTALLATION |
Penerangan CU | Final product installation describes the competency in fitting and setting the finished product on site according to installation method and construction drawing. A competent person in this CU shall be able to identify fabrication installation works requirements, perform installation works and clean installation area. The outcome of this competency is to ensure that the finished product is erected in accordance with construction drawing |
Tempoh Latihan | 72 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to ensure that the finished product is erected in accordance with construction drawing. Upon completion of this competency units, trainees will be able to:- 1. Identify fabrication installation works requirements 2. Perform installation works 3. Perform housekeeping |
Pra-Syarat | 0 |