Job Description (JD)
Nama Program | PEMASANGAN, PERUBAHAN DAN PENANGGALAN PERANCAH ASAS [BC-061-1:2015] |
---|---|
Kod CU | BC-061-1:2015-C06 |
Competency | Core |
Tajuk CU | PUTLOG SCAFFOLDERECTION,ALTERATION ANDDISMANTLING |
Penerangan CU | Putlog scaffold are types of scaffold erected from the base consisting of a single row of standard and it is normally use for brick laying work. The putlogs or transoms are attached to the ledger at one end and integrated into the bricks at the other end by using suitable fitting. The personnel who is competent in this CU shall be able to Comply with Safety Health and Environment requirements, perform scaffold design sketching, prepare scaffold site, erect Tubular and perform housekeeping. The outcome of this competency is to ensure the Putlog Scaffold erected, altered and dismantled safely and correctly. |
Tempoh Latihan | 52 |
Objektif Pembelajaran | The person who is competent in this competency unit shall be able to ensure the Putlog Scaffold erected, altered and dismantled safely and correctly. Upon completion of this competency unit, trainees will be able to:- -Comply with Safety Health And Environment Requirements -Perform Scaffold Design Sketching -Prepare Scaffold Site -Erect Tubular Scaffold -Perform Housekeeping |
Pra-Syarat | 0 |