Nama ProgramPEMASANGAN, PERUBAHAN DAN PENANGGALAN PERANCAH ASAS [BC-061-1:2015]
Kod CUBC-061-1:2015-C06
CompetencyCore
Tajuk CUPUTLOG SCAFFOLDERECTION,ALTERATION ANDDISMANTLING
Penerangan CUPutlog scaffold are types of
scaffold erected from the base
consisting of a single row of
standard and it is normally use for
brick laying work.
The putlogs or transoms are
attached to the ledger at one end
and integrated into the bricks at
the other end by using suitable
fitting.
The personnel who is competent
in this CU shall be able to Comply
with Safety Health and
Environment requirements,
perform scaffold design
sketching, prepare scaffold site,
erect Tubular and perform
housekeeping.
The outcome of this competency
is to ensure the Putlog Scaffold
erected, altered and dismantled
safely and correctly.
Tempoh Latihan52
Objektif PembelajaranThe person who is competent in this competency unit shall be able to ensure the Putlog Scaffold erected, altered
and dismantled safely and correctly. Upon completion of this competency unit, trainees will be able to:-
-Comply with Safety Health And Environment Requirements
-Perform Scaffold Design Sketching
-Prepare Scaffold Site
-Erect Tubular Scaffold
-Perform Housekeeping
Pra-Syarat0