Job Description (JD)
Nama Program | PEMASANGAN, PERUBAHAN DAN PENANGGALAN PERANCAH PERTENGAHAN [BC-061-2:2015] |
---|---|
Kod CU | BC-061-2:2015-C03 |
Competency | Core |
Tajuk CU | BARROW RAMPERECTION,ALTERATION ANDDISMANTLING |
Penerangan CU | Barrow ramps are a specific type of sloping platform. They are cleated and house a running board for maximum efficiency when moving up and down the slope The personnel who is competent in this CU shall be able to Comply with Safety Health and Environment requirements, perform scaffold design sketching, prepare scaffold site, erect Tubular scaffold and perform housekeeping. The outcome of this competency is to ensure the Barrow Ramp erected, altered and dismantled safely and correctly. |
Tempoh Latihan | 52 |
Objektif Pembelajaran | The person who is competent in this competency unit shall be able to ensure the Barrow Ramp erected, altered and dismantled safely and correctly. Upon completion of this competency unit, trainees will be able to:- -Comply with Safety Health And Environment Requirements -Perform Scaffold Design Sketching - Prepare Scaffold Site - Erect Tubular Scaffold - Perform Housekeeping |
Pra-Syarat | 0 |