JOB DESCRIPTION

Job Description (JD)

Nama ProgramPEMASANGAN, PERUBAHAN DAN PENANGGALAN PERANCAH LANJUTAN [BC-061-3:2015]
Kod CUBC-061-3:2015-C03
CompetencyCore
Tajuk CUSHORING SYSTEM (FALSE WORK) ERECTION, ALTERATION AND DISMANTLING
Penerangan CUFalsework consist of temporary structure used in construction to support spanning or arched structures in order to hold the component in place until its construction is sufficiently advanced to support itself. This usage is specially called cantering.

Falsework also includes temporary support structures for formwork used to mould concrete to form a desired shape, scaffolding to give workers access to the structure being constructed, and shoring which is temporary structural reinforcement used during repairs.

The personnel who are competent in this CU shall be able to Comply with Safety Health and Environment requirements, calculate scaffold material, prepare scaffold site, erect Frame, Tubular & Modular scaffold and perform housekeeping.

The outcome of this competency is to ensure the Shoring System (False Work) Scaffold erected, altered and dismantled safely and correctly.
Tempoh Latihan100
Objektif PembelajaranThe person who is competent in this competency unit shall be able to ensure the Shoring System (False Work) Scaffold erected, altered and dismantled safely and correctly. Upon completion of this competency unit, trainees will be able to:-
• Comply with Safety Health and Environment Requirements
• Calculate Scaffold Material
• Prepare Scaffold Site
• Erect Frame Scaffold
• Erect Tubular Scaffold
• Erect Modular Scaffold
• Perform Housekeeping
Pra-Syarat0