Job Description (JD)
Nama Program | PEMASANGAN, PERUBAHAN DAN PENANGGALAN PERANCAH LANJUTAN [BC-061-3:2015] |
---|---|
Kod CU | BC-061-3:2015-C04 |
Competency | Core |
Tajuk CU | SHORING SYSTEM (FLYING SHORE) ERECTION, ALTERATION AND DISMANTLING |
Penerangan CU | Shoring system is to supports freshly placed concrete is necessarily supported by lower floors which may not yet have attained their full strength, and which may not have been designed to carry loads as great as those imposed during construction. The personnel who are competent in this CU shall be able to Comply with Safety Health and Environment requirements, calculate scaffold material, prepare scaffold site, erect Tubular scaffold and perform housekeeping. The outcome of this competency is to ensure the Shoring System (Flying Shore) Scaffold erected, altered and dismantled safely and correctly. |
Tempoh Latihan | 52 |
Objektif Pembelajaran | The person who is competent in this competency unit shall be able to ensure the Shoring System (Flying Shore) Scaffold erected, altered and dismantled safely and correctly. Upon completion of this competency unit, trainees will be able to:- - Comply with Safety Health and Environment Requirements - Calculate Scaffold Material - Prepare Scaffold Site - Erect Tubular Scaffold - Perform Housekeeping |
Pra-Syarat | 0 |