JOB DESCRIPTION

Job Description (JD)

Nama ProgramPEMASANGAN, PERUBAHAN DAN PENANGGALAN PERANCAH LANJUTAN [BC-061-3:2015]
Kod CUBC-061-3:2015-C05
CompetencyCore
Tajuk CUSHORING SYSTEM (RAKING SHORE) ERECTION, ALTERATION AND DISMANTLING
Penerangan CUShoring system is to supports freshly placed concrete is necessarily supported by lower floors which may not yet have attained their full strength, and which may not have been designed to carry loads as great as those imposed during construction.

The personnel who are competent in this CU shall be able to Comply with Safety Health and Environment requirements, calculate scaffold material, prepare scaffold site, erect Tubular scaffold and perform housekeeping.

The outcome of this competency is to ensure the Shoring System (Raking Shore) Scaffold erected, altered and dismantled safely and correctly.
Tempoh Latihan52
Objektif PembelajaranThe person who is competent in this competency unit shall be able to ensure the Shoring System (Raking Shore) Scaffold erected, altered and dismantled safely and correctly. Upon completion of this competency unit, trainees will be able to:- - Comply with Safety Health and Environment Requirements - Calculate Scaffold Material - Prepare Scaffold Site - Erect Tubular Scaffold - Perform Housekeeping
Pra-Syarat0