Job Description (JD)
Nama Program | Operasi Penyelenggaraan Peralatan Statik (Minyak & Gas) [C192-006-3:2019] |
---|---|
Kod CU | C192-006-3:2019-C03 |
Competency | Core |
Tajuk CU | STATIC EQUIPMENT NEW INSTALLATION & COMMISSIONING EXECUTION |
Penerangan CU | Static Equipment New Installation & Commissioning Execution describe the procedures and steps to install & commission static equipment on designated location according to OEM manual and company’s SOP. A competent person in this CU shall be able to interpret work instructions, check tools & equipment, install static equipment, perform equipment alignment and connection of piping & accessories, conduct static equipment pre-commissioning activities, conduct static equipment commissioning activities and prepare handover report. The outcome of this competency is static equipment installed and commissioned according to OEM manual and company’s SOP. |
Tempoh Latihan | 110 |
Objektif Pembelajaran | The outcome of this competency unit is static equipment installed and commissioned according to OEM manual and company’s SOP. Upon completion of this competency unit, trainees shall be able to: 1. Interpret work instructions. 2. Check tools & equipment. 3. Install static equipment. 4. Perform equipment alignment and connection of piping & accessories. 5. Conduct static equipment pre-commissioning activities. 6. Conduct static equipment commissioning activities. 7. Prepare handover report. |
Pra-Syarat | Not Available |