Job Description (JD)
Nama Program | Operasi Air Tidak Berhasil [CM-022-2:2016] |
---|---|
Kod CU | CM-022-2:2016-C03 |
Competency | Core |
Tajuk CU | NRW Step Test Operation |
Penerangan CU | determine any leakage at water pipeline system when a district metering area (DMA) is shut off into several sub-areas and the flow rate monitored in real time. This kind of pre-location is usually performed at night, at the time when the flow rate is expected to be at its lowest. If there is a leak within a sub-area, the flow drops disproportionately to the other areas and looks like a step when displayed graphically The person who is competent in NRW Step Test Operation shall be able to arrange step test sequence, confirm minimum night flow time, close step valve by sequence and arrange leakage area inspection The outcome of this competency is to narrow down suspected leakage location of DMA so that the leakage point detection can be done in short period of time according to NRW requirement. The personnel who will be competent in this competency must in prior have the following competencies:- -none- |
Tempoh Latihan | 100 |
Objektif Pembelajaran | The person who is competent in this competency unit shall be able to narrow down suspected leakage location of DMA so that the leakage point detection can be done in short period of time according to NRW requirement. Upon completion of this competency unit, trainees will be able to:- Arrange step test sequence Confirm minimum night flow time Close step valve by sequence Arrange leakage area inspection |
Pra-Syarat | 0 |