Job Description (JD)
Nama Program | Penyeliaan Instrumentasi Bekalan Air [E360-003-3:2019] |
---|---|
Kod CU | E360-3:2018-C02 |
Competency | Core |
Tajuk CU | INSTRUMENTATION SYSTEM TESTING AND COMMISSIONING |
Penerangan CU | Instrumentation System Testing And Commissioning describes the competency required to verify instruments and system, system integration and interfacing to an existing system to give significant operational benefits to achieve proficient treatment processes of water supply This competency unit is important to ensure installation are safe and meet the design requirement. The person who is competent in this CU shall be able to prepare testing and commissioning work requirement, perform instrumentation system testing and commissioning and prepare testing and commissioning report. The outcome of this competency is to ensure that instrument and control system used being validated and tested in accordance to operational procedures and meet SOP and safety guidelines. |
Tempoh Latihan | 220 |
Objektif Pembelajaran | The outcome of this competency unit is to ensure that instrument and control system used being validated and tested in accordance with SOP, O & M manual and meet safety guidelines. |
Pra-Syarat | Not available |