Job Description (JD)
Nama Program | Kawalan Operasi Air Tidak Berhasil [CM-022-3:2016] |
---|---|
Kod CU | CM-022-3:2016-C02 |
Competency | Core |
Tajuk CU | DISTRICT METERING AREA (DMA) SINGLE FEEDER CREATION |
Penerangan CU | District metering area (DMA) can be easily monitored and controlled by using single feeder pipeline for water supply. If there is more than one supply, the best pipeline, which meet the criteria or specification will be choose as single feeder. To determine the actual specification or before the actual installation, the piloting work must be done to check the pipe alignment, size and material on site. The person who is competent in District Metering Area (DMA) creation control shall be able to conduct piloting work preparation, monitor piloting work and select source of supply for single feeder The outcome of this competency is to determine and choose the best pipeline for single feeder at DMA according to NRW requirement. The personnel who will be competent in this competency must in prior have the following competencies:- -none- |
Tempoh Latihan | 130 |
Objektif Pembelajaran | The person who is competent in this competency unit shall be able to create single feeder water supply to DMA according to NRW operation requirement. Upon completion of this competency unit, trainees will be able to:- Conduct piloting work preparation Monitor piloting work Select source of supply for single feeder |
Pra-Syarat | 0 |