Job Description (JD)
Nama Program | Pengurusan Operasi Instrumentasi Bekalan Air [E360-003-4:2019] |
---|---|
Kod CU | E360-003-4:2019-C01 |
Competency | Core |
Tajuk CU | INSTRUMENTATION INSTALLATION MONITORING AND CONTROL |
Penerangan CU | Instrumentation Installation Monitoring and Control is performed in order to monitor the installation of instruments and systems for the measurement of water pressure, level, flow and water quality to achieve proficient treatment processes of water supply. The person who is competent in the CU shall be able to determine instrumentation installation requirements, prepare installation work program, prepare installation method statement, monitor instrumentation installation works and verify instrumentation installation works. The goal and outcome of having the competency unit is to ensure instrument installed is functioning as per design and manufacturer’s manual that give guarantee of proficient treatment processes of water quality parameters. |
Tempoh Latihan | 240 |
Objektif Pembelajaran | The outcome of this competency unit is to ensure instrumentation installed is functioning as per design and manufacturer’s manual that give guarantee of proficient treatment processes of water quality parameters. Upon completion of this competency unit, trainees shall be able to: 1. Determine instrumentation installation requirements 2. Prepare installation work program 3. Prepare installation method statement 4. Monitor instrumentation installation works 5. Verify instrumentation installation works 6. Prepare inspection and testing plan 7. Verify testing and commissioning installation works |
Pra-Syarat | Not Available |