Job Description (JD)
Nama Program | Operasi Pembinaan Bangunan [F410-001-2:2019] |
---|---|
Kod CU | F410-001-2:2019-C07 |
Competency | Core |
Tajuk CU | BUILDING PRECAST CONCRETE INSTALLATION |
Penerangan CU | Building Precast Concrete Installation describes the competencies required to install precast concrete column, beam, slab, wall panel, and staircase in building construction. A competent person in this CU shall be able to install precast concrete column, install precast concrete beam, install precast concrete slab, install precast concrete wall panel, and install precast concrete staircase. The outcome of this competency is the safety and accuracy of precast concrete column, beam, slab, wall panel, and staircase installation complied into the required position and orientation in accordance with method statement. |
Tempoh Latihan | 60 |
Objektif Pembelajaran | The outcome of this competency unit is the safety and accuracy of precast concrete column, beam, slab, wall panel, and staircase installation complied into the required position and orientation in accordance with method statement. Upon completion of this competency unit, trainees shall be able to: 1. Install precast concrete column 2. Install precast concrete beam 3. Install precast concrete slab 4. Install precast concrete wall panel 5. Install precast concrete staircase |
Pra-Syarat | Not Available |