Job Description (JD)
Nama Program | Penyeliaan Operasi Pembinaan Bangunan [F410-001-3:2019] |
---|---|
Kod CU | F410-001-3:2019-C05 |
Competency | Core |
Tajuk CU | PILING MONITORING |
Penerangan CU | Piling Monitoring describes the activities to check piling work for building construction which include driven and pile testing work during piling work in accordance with drawing, method of statement and specification A competent person in this CU shall be able to monitor driven / injection pile, monitor load test and monitor Pile Driving Analyser (PDA) The outcome of this competency is to ensure the piling work carried out in accordance to drawing and specification. |
Tempoh Latihan | 110 |
Objektif Pembelajaran | The outcome of this competency is to ensure the piling work carried out in accordance to drawing and specification. Upon completion of this competency unit, trainees shall be able to: 1. Monitor driven / injection pile work 2. Monitor load test 3. Monitor Pile Driving Analyser (PDA) |
Pra-Syarat | Not Available |