Job Description (JD)
Nama Program | PEMASANGAN KENDERAAN GAS ASLI TERMAMPAT [G452-004-3:2019] |
---|---|
Kod CU | G452-004-3:2019-C01 |
Competency | Core |
Tajuk CU | PRE-VEHICLE INSPECTION |
Penerangan CU | Pre-Vehicle Inspection describes the inspection and testing procedure for checking the condition of vehicle before installing the CNG system. The person whom is competent in this CU shall be able to carry out engine compression test, carry out cooling system test, carry out fuel system test, carry out ignition system test, carry out body & suspension condition test and carry out matching CNG kit for the vehicle. The outcome of this CU is to confirm the condition of vehicle and match the CNG kit suitable for installation in compliance with MS1096, UNECE R110 and UNECE R115. |
Tempoh Latihan | 130 |
Objektif Pembelajaran | The outcome of this CU is to confirm the condition of vehicle and match the CNG kit suitable for installation in compliance with MS1096, UNECE R110 and UNECE R115. Upon completion of this competency unit, trainees shall be able to: 1. Carry out engine compression test 2. Carry out cooling system test 3. Carry out fuel system test 4. Carry out ignition system test 5. Carry out body & suspension condition test 6. Carry out matching CNG kit for the vehicle |
Pra-Syarat | Not Available |