Job Description (JD)
Nama Program | PEMASANGAN KENDERAAN GAS ASLI TERMAMPAT [G452-004-3:2019] |
---|---|
Kod CU | G452-004-3:2019-C03 |
Competency | Core |
Tajuk CU | CNG FUEL SYSTEM COMPONENTS INSTALLATION |
Penerangan CU | CNG Fuel System Component Installation describe the process of installation of a CNG cylinder, refilling valve, fuel rail and piping, wiring harness construction and installation of each CNG component in the vehicle. The person who is competent in this CU shall be able to carry out CNG cylinder installation, carry out CNG refilling valve, carry out CNG fuel-rail and high pressure pipe installation, carry out CNG wire harness construction and installation. The outcome of this CU is to ensure all components fabricated and installed according to MS1096, UNECE R110 and UNECE R115. |
Tempoh Latihan | 210 |
Objektif Pembelajaran | The outcome of this CU is to ensure all components fabricated and installed according to MS1096, UNECE R110 and UNECE R115. Upon completion of this competency unit, trainees shall be able to: 1. Carry out CNG cylinder and cylinder valve (mechanical / electrical) installation. 2. Carry out CNG refilling and shut off valve installation 3. Carry out CNG fuel-rail and high pressure pipe installation 4. Carry out CNG pressure reducer/regulator system’s components installation 5. Carry out CNG wire harness construction and installation |
Pra-Syarat | Not Available |