JOB DESCRIPTION

Job Description (JD)

Nama ProgramPEMASANGAN KENDERAAN GAS ASLI TERMAMPAT [G452-004-3:2019]
Kod CUG452-004-3:2019-C03
CompetencyCore
Tajuk CUCNG FUEL SYSTEM COMPONENTS INSTALLATION
Penerangan CUCNG Fuel System Component Installation describe the process of installation of a CNG cylinder, refilling valve, fuel rail and piping, wiring harness construction and installation of each CNG component in the vehicle.

The person who is competent in this CU shall be able to carry out CNG cylinder installation, carry out CNG refilling valve, carry out CNG fuel-rail and high pressure pipe installation, carry out CNG wire harness construction and installation.

The outcome of this CU is to ensure all components fabricated and installed according to MS1096, UNECE R110 and UNECE R115.
Tempoh Latihan210
Objektif PembelajaranThe outcome of this CU is to ensure all components fabricated and installed according to MS1096, UNECE R110 and UNECE R115. Upon completion of this competency unit, trainees shall be able to:
1. Carry out CNG cylinder and cylinder valve (mechanical / electrical) installation.
2. Carry out CNG refilling and shut off valve installation
3. Carry out CNG fuel-rail and high pressure pipe installation
4. Carry out CNG pressure reducer/regulator system’s components installation
5. Carry out CNG wire harness construction and installation
Pra-SyaratNot Available