Job Description (JD)
Nama Program | PEMASANGAN KENDERAAN GAS ASLI TERMAMPAT [G452-004-3:2019] |
---|---|
Kod CU | G452-004-3:2019-C04 |
Competency | Core |
Tajuk CU | POST CONVERSION INSPECTION |
Penerangan CU | Post Conversion Inspection describe the inspection of system leakage using gas detectors etc to verify it when completing the installation of the CNG system. The person who is competent in this CU shall be able to carry out CNG system leakage test, carry out CNG electrical components functionality test, carry out performance test, carry out vehicle ground clearance measurement, carry out RTD documentation and vehicle road testing. The outcome of this CU is to confirm every part and system are running according to specification. |
Tempoh Latihan | 390 |
Objektif Pembelajaran | The outcome of this CU is to confirm every part and system are running according to specification. Upon completion of this competency unit, trainees shall be able to: 1. Carry out CNG system leakage test 2. Carry out CNG electrical components functionality test 3. Carry out performance test 4. Carry out vehicle ground clearance measurement 5. Carry out RTD documentation and vehicle road testing |
Pra-Syarat | Not Available |