Job Description (JD)
Nama Program | IBS BLOCKWORK SYSTEM INSTALLATION SUPERVISION [F410-002-3:2017] |
---|---|
Kod CU | F410-002-3:2017-C01 |
Competency | Core |
Tajuk CU | IBS INSTALLATION RESOURCES PREPARATIONS |
Penerangan CU | IBS Installation Resources Preparations describes the competencies in preparing work instructions, manpower arrangement, material preparations and safety and health compliance in blockwork system installation activities. A competent person in this CU shall be able to prepare work instruction, identify storage area, identify tools, equipment and materials requirements, identify manpower requirement, perform installation arrangement and monitor work progress The outcome of this competency is to set up blockwork installation in accordance with manufacturer guideline and Occupational Safety and Health Act, 1994 |
Tempoh Latihan | 248 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to perform IBS Installation Preparation Supervision in accordance to Work Instruction and Manufacturer specification. Upon completion of this competency units, trainees will be able to:- 1. Prepare Work Instruction 2. Arrange logistical requirements 3. Arrange Tools, Equipment and 4. Arrange manpower resources |
Pra-Syarat | 0 |