Job Description (JD)
Nama Program | PENYELIAAN PEMASANGAN KEKUDA BUMBUNG LOGAM RINGAN IBS [F410-006-3:2018] |
---|---|
Kod CU | F410-006-3:2018-C02 |
Competency | Core |
Tajuk CU | IBS LIGHTWEIGHT ROOF TRUSSES INSTALLATION INSPECTION |
Penerangan CU | IBS lightweight roof trusses installation inspection describes the competency in supervising all the activities involved when erecting and installing trusses to its designated position. A competent person in this CU shall be able to supervise truss hoisting, supervise truss erection, supervise truss levelling and alignment, supervise bracing work, supervise batten/purlin installation, perform final joint inspection and prepare final report. The outcome of this competency is to ensure that the work process done are according to Standard Operating Procedure (SOP) and the result of the process are according to construction drawing requirements. |
Tempoh Latihan | 320 |
Objektif Pembelajaran | The outcome of this competency is to ensure that the trusses installation is according to Standard Operating Procedure (SOP) and construction drawing requirements. Upon completion of this competency unit, trainees shall be able to:- 1. Supervise truss hoisting 2. Supervise truss installation 3. Supervise bracing work 4. Supervise batten installation 5. Perform final joint inspection 6. Prepare final report |
Pra-Syarat | 0 |