Job Description (JD)
Nama Program | PEMASANGAN STRUKTUR BESI IBS [F433-003-2:2018] |
---|---|
Kod CU | F433-003-2:2018-C04 |
Competency | Core |
Tajuk CU | IBS STEEL FLOOR JOIST INSTALLATION |
Penerangan CU | IBS steel floor joist installation is a set of competency in fixing of structural floor joist consists of the assembly of steel floor joist components on site. The processes involve lifting and placing floor joist components into position, then connecting them together. A competent person in this CU shall be able to identify floor joist structure installation requirements, carry out floor joist component assembling, carry out Cold Formed floor joist structure fixing, carry out hold rolled floor joist structure fixing and update IBS installation checklist The outcome of this competency is to ensure the floor joist are fixed based on construction drawing and the IBS structure integrity meet the determined specification. |
Tempoh Latihan | 80 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to ensure the floor joist are fixed based on construction drawing and the IBS structure integrity meet the determined specification. Upon completion of this competency units, trainees will be able to: - 1. Identify floor joist structure installation requirements 2. Carry out floor joist component assembling 3. Carry out Cold Formed floor joist structure fixing 4. Carry out Hot Rolled floor joist structure fixing |
Pra-Syarat | 0 |