Job Description (JD)
Nama Program | PEMASANGAN RETIKULASI AIR [F432-004-2:2018] |
---|---|
Kod CU | F432-004-2:2018-C03 |
Competency | Core |
Tajuk CU | WATER RETICULATION VALVE INSTALLATION |
Penerangan CU | A valve is a flow control device along such a network of pipes. The work are including install fire hydrant, marker post, valve support and valve chamber A competent person in this CU shall be able to prepare tools, equipment and machinery, perform valve installation, install fire hydrant and prepare water reticulation valve installation report The outcome of this competency is to ensure that all works are in compliance with Occupational Safety And Health Act (OSHA) requirement, technical specification, approved detail drawing and Uniform Technical Guideline (UTG) |
Tempoh Latihan | 84 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to ensure that all works are in compliance with Occupational Safety And Health Act (OSHA) requirement, technical specification, approved detail drawing and Uniform Technical Guideline (UTG). Upon completion of this competency units, trainees will be able to:- 1. Prepare tools, equipment and machinery for valve installation 2. Perform valve installation 3. Install fire hydrant |
Pra-Syarat | 0 |