Job Description (JD)
Nama Program | PEMASANGAN RETIKULASI AIR [F432-004-2:2018] |
---|---|
Kod CU | F432-004-2:2018-C08 |
Competency | Core |
Tajuk CU | WATER RETICULATION PIPE MAINTENANCE |
Penerangan CU | Water reticulation pipe maintenance works describes the competency in performing inspection on faulty materials and carry out the repair and replacement works A competent person in this CU shall be able to prepare tools and equipment, repair water reticulation pipe and joint leakage, conduct water valve servicing, repair water reticulation valve leakage, repair fire hydrant leakage and perform flow meter replacement The outcome of this competency is to ensure that all works are in compliance with Occupational Safety And Health Act (OSHA) requirement, As-built drawing, Standard Operating Procedure (SOP) and Uniform Technical Guideline (UTG) |
Tempoh Latihan | 246 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to ensure that all works are in compliance with Occupational Safety And Health Act (OSHA) requirement, As-built drawing, Standard Operating Procedure (SOP) and Uniform Technical Guideline (UTG). Upon completion of this competency units, trainees will be able to:- 1. Prepare tools and equipment pipe maintenance 2. Repair water reticulation pipe and joint leakage 3. Conduct water valve servicing 4. Repair water reticulation valve leakage 5. Repair fire hydrant leakage 6. Perform flow meter replacement |
Pra-Syarat | 0 |