Job Description (JD)
Nama Program | PEMASANGAN SISTEM ACUAN GUNA SEMULA IBS [F410-003-2:2017] |
---|---|
Kod CU | F410-003-2:2017-C04 |
Competency | Core |
Tajuk CU | IBS REUSABLE FORMWORK SYSTEM INSTALLATION (TIMBER) |
Penerangan CU | IBS Reusable formwork system installation (timber) is a design formwork as a temporary mould which is able to cast concrete for the beam, wall, slab, column and lift shaft in one casting. The competent person in this CU shall be able to interpret latest shop drawing, erect IBS timber formwork for reinforce concrete structure, check timber formwork installation, dismantle IBS timber formwork after concreting and perform housekeeping activities. The outcome of this competency is the ability to install a stable timber formwork to withstand all types of dead and live loads in the correct position in accordance with latest updated drawing. |
Tempoh Latihan | 150 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to install a stable timber formwork to withstand all types of dead and live loads in the correct position in accordance with latest updated drawing. Upon completion of this competency units, trainees will be able to:- 1. Interpret latest shop drawing 2. Erect reusable formwork system (timber) for reinforced concrete structure 3. Check timber formwork installation 4. Dismantle reusable formwork system (timber) after concreting 5. Perform housekeeping activities |
Pra-Syarat | 0 |