Job Description (JD)
Nama Program | PENYELIAAN PEMASANGAN PANEL RINGAN (LANTAI & DINDING) IBS [F410-005-3:2018] |
---|---|
Kod CU | F410-005-3:2018-C02 |
Competency | Core |
Tajuk CU | IBS Lightweight Panel (Non-Structural) Installation Inspection |
Penerangan CU | IBS Lightweight Panel (Non-Structural) installation inspection describe the competency in carry out inspection on each area of Lightweight Panel (Non-Structural) installation works including column and beam based on determined criteria. A competent person in this CU shall be able to identify quality inspection requirement, carry out slab installation inspection, carry out wall panel installation inspection, and prepare IBS Lightweight Panel (Non-Structural) inspection report. The outcome of this competency is to ensure the structure integrity of the IBS is according to determined specification specified on IBS construction drawing. |
Tempoh Latihan | 215 |
Objektif Pembelajaran | The outcome of this competency unit is to ensure the structure integrity of the IBS is according to a determined specification specified on IBS construction drawing. Upon completion of this competency unit, trainees shall be able to: 1. Identify quality inspection requirements 2. Carry out slab installation inspection 3. Carry out wall panel installation inspection 4. Prepare IBS Lightweight Panel (Non-Structural) inspection report |
Pra-Syarat | 0 |