Job Description (JD)
Nama Program | PENYELIAAN PEMASANGAN SISTEM ACUAN GUNA SEMULA IBS [F410-003-3:2017] |
---|---|
Kod CU | F410-003-3:2017-C02 |
Competency | Core |
Tajuk CU | IBS reusable formwork system installation inspection |
Penerangan CU | IBS reusable formwork system installation inspection involves the supervision activities for measurements applied to certain characteristics in regard to reusable formwork system and finishing concrete. The results are usually compared to specified requirements and standards for determining whether the reusable formwork system is in line with these targets, often with a Standard Inspection Procedure in place to ensure consistent checking. A competent person in this CU shall be able to confirm completed installation of reusable formwork systemaccording to latest updated drawing, prepare for inspection with clerk of works (authorised personnel / inspector), conduct physical inspection and inspect concrete surface finishing after dismantling reusable formwork system. The outcome of this competency is to identify any potential issues during installation formwork carried out, to overcome those identified issues and fulfil formwork quality requirements according to company’s Standard Operating Procedures (SOP). |
Tempoh Latihan | 180 |
Objektif Pembelajaran | The person who is competent in this CU shall be able to identify any potential issues during installation formwork carried out, to overcome those identified issues and fulfil formwork quality requirements according to company’s Standard Operating Procedures (SOP). Upon completion of this competency units, trainees will be able to:- 1. Confirm completionof installation 2. Prepare for inspection with clerk of works 3. Conduct physical inspection 4. Inspect concrete surface finishing after dismantling reusable formwork system |
Pra-Syarat | 0 |