Job Description (JD)
Nama Program | Operasi Pam Konkrit [F439-004-1:2019] |
---|---|
Kod CU | F439-004-1:2019-C04 |
Competency | Core |
Tajuk CU | CONCRETE PUMP PIPELINE MAINTENANCE WORK |
Penerangan CU | Concrete Pump Pipeline Maintenance Work is the preventive maintenance of pipeline that is an essential part of the on-going care and upkeep to avoid breakdown or malfunction. The person who is competent in this CU shall be able to perform pipeline breakdown maintenance, perform pipeline scheduled maintenance and perform pipeline housekeeping work according to manufacturer’s manual. The outcome of this competency is to prevent damage to pipeline, reduce unscheduled downtime and ensure continuous and safe operation of equipment in accordance with manufacturer’s manual. |
Tempoh Latihan | 80 |
Objektif Pembelajaran | The outcome of this competency unit is to prevent damage to pipeline, reduce unscheduled downtime and ensure continuous and safe operation of equipment in accordance with manufacturer’s manual. Upon completion of this competency unit, trainees shall be able to: 1. Perform pipeline breakdown maintenance. 2. Perform pipeline scheduled maintenance. 3. Perform pipeline housekeeping work. |
Pra-Syarat | Not Available |