Job Description (JD)
Nama Program | Pemasangan dan Penyelenggaraan Elektrik Tiga Fasa [F432-005-3:2019] |
---|---|
Kod CU | F432-005-3:2019-C01 |
Competency | Core |
Tajuk CU | THREE PHASE DRAWING |
Penerangan CU | Three Phase Drawing describes the competency to calculate current diversity value and produce three phase schematic diagram and layout plan. The person who is competent in this CU should be able to prepare three phase drawing requirements, perform three phase drawing and propose three phase drawing paperwork. The outcome of this CU is a three phase drawing consisting of layout plan that shows installation location and a three phase schematic diagram that shows information regarding wiring installation that is required by wireman according to MS IEC 60364, MS 1979:2007, MS 1936:2006, Electricity Supply Act 1990 (Act 447), Electricity Regulation 1994, The Electricity Ordinance- Chapter 50 (Revised 2003), Electricity Rules 1999, Electricity (State Grid Code) Rules 2003 and relevant regulatory body |
Tempoh Latihan | 70 |
Objektif Pembelajaran | The learning outcomes of this competency are trainees enable to produce a three phase drawing consisting of layout plan that shows installation location and a three phase schematic diagram that shows information regarding wiring installation that is required by wireman according to MS IEC 60364, MS 1979:2007, MS 1936:2006, Electricity Supply Act 1990 (Act 447), Electricity Regulation 1994, The Electricity Ordinance- Chapter 50 (Revised 2003), Electricity Rules 1999, Electricity (State Grid Code) Rules 2003 and relevant regulatory body. Upon completion of this competency unit, trainees should be able to: 1. Prepare three phase drawing requirements . 2. Perform three phase drawing. 3. Propose three phase drawing paperwork. |
Pra-Syarat | 0 |