Job Description (JD)
Nama Program | Penyeliaan Pemasangan "Cladding" [F433-005-3:2019] |
---|---|
Kod CU | F433-005-3:2019-C05 |
Competency | Core |
Tajuk CU | Cladding Installation Quality Control |
Penerangan CU | Cladding Installation Quality Control describes the competency in monitoring and inspection of formwork, reinforcement, concrete work, and prefab component during cladding installation work. A competent person in this CU shall be able to verify cladding material quality, verify alignment and levelling, monitor cladding installation work,check cladding installation work and close cladding work NCR audit findings. The person must possess CIDB Construction Personnel Card to perform the competency unit on site. The outcome of this competency is cladding installation work carried out accuratelyaccordingly to construction drawing and specification. |
Tempoh Latihan | 240 |
Objektif Pembelajaran | The outcome of this competency unit is to ensure cladding installation work carried out accordingly to drawing and specification. Upon completion of this competency unit, trainees shall be able to: 1. Verify cladding material quality. 2. Verify alignment and levelling. 3. Monitor cladding installation work. 4. Check cladding installation work. 5. Solve cladding work NCR audit findings. |
Pra-Syarat | 0 |