JOB DESCRIPTION

Job Description (JD)

Nama ProgramPenyeliaan Pemasangan & Penyelenggaraan Skrin LED [F432-006-3:2020]
Kod CUF432-006-3:2020-C01
CompetencyCore
Tajuk CULED Display System Project Pre Installation
Penerangan CULED Display System Project Pre Installation describes the competency in carrying out pre installation involves all the activities before installation takes place. The technician conducts site visit to collect installation information. The information should include materials, tools and equipment specification, testing requirements, personnel experience level and assignment, installation methods, identification of potential problem areas and safety issues. Then, work permit must be obtained before starting the installation.

The person who is competent in this CU should be able to identify project pre installation requirements, conduct installation site visit, arrange local authority/ service provider approval, prepare work breakdown schedule, arrange material, tools and equipment requisition and report LED display system project pre installation activities.

The outcome of this CU is the project schedule produced and accurate information on the installation work collected according to customer requirements.

Tempoh Latihan112
Objektif PembelajaranThe learning outcome of this competency unit is trainees are enable to produce the project schedule and collect accurate information on the installation work according to job order.

Upon completion of this competency unit, trainees should be able to:
1. Identify project pre installation requirements.
2. Conduct installation site visit.
3. Arrange local authority/ service provider approval.
4. Prepare work breakdown schedule.
5. Arrange material, tools and equipment requisition.
6. Report LED display system project pre installation activities.
Pra-Syarat0