Job Description (JD)
Nama Program | Pemasangan dan Penyelenggaraan Satu Fasa Penyamanan Udara, Pengudaraan, Pemanasan (HVAC) [F432-007-3:2020] |
---|---|
Kod CU | F432-007-3:2020-C01 |
Competency | Core |
Tajuk CU | Single Phase Heating Equipment Installation |
Penerangan CU | Single Phase Heating Equipment Installation describes the installation of heating equipment such as water heater and heater, to provide for consumer’s usage at home, industry and offices.The person who is competent in this CU should be able to perform fitting works, install mounting bracket/plate, install piping system, install heating unit, install equipment wiring system and record installation process.The outcomes of this CU are heating equipment safety, performance and energy efficiency complied with manufacturer’s specifications Occupational Safety, Health and Environment (OSHE) requirements. |
Tempoh Latihan | 110 |
Objektif Pembelajaran | The learning outcomes of this competency unit are trainees enable to install single phase heating equipment ensuring equipment safety, performance and energy efficiency in compliance with manufacturer’s specifications and Occupational Safety, Health and Environment (OSHE) requirements. Upon completion of this competency unit, trainees should be able to: 1. Perform fitting works. 2. Install mounting bracket/plate. 3. Install piping system. 4. Install heating unit. 5. Install equipment wiring system. 6. Record installation process. |
Pra-Syarat | 0 |