Job Description (JD)
Nama Program | Pemasangan dan Penyelenggaraan Satu Fasa Penyamanan Udara, Pengudaraan, Pemanasan (HVAC) [F432-007-3:2020] |
---|---|
Kod CU | F432-007-3:2020-C02 |
Competency | Core |
Tajuk CU | Single Phase Ventilation Equipment Installation |
Penerangan CU | Single Phase Ventilation Equipment Installation describes the ventilation equipment such as exhaust fan and ducting system, to provide consumer usage at home, industry and offices.The person who is competent in this CU should be able to perform fitting works, install mounting bracket/plate, install ventilation unit, install equipment wiring system, install ventilation ducting system and record installation process.The outcomes of this CU are ventilation equipment safety and performance, complied with manufacturer’s specifications and Occupational Safety, Health and Environment (OSHE) requirements. |
Tempoh Latihan | 220 |
Objektif Pembelajaran | The learning outcomes of this competency unit are trainees enable to install single phase ventilation equipment ensuring equipment safety and performance, in compliance with manufacturer’s and Occupational Safety, Health and Environment (OSHE) requirements. Upon completion of this competency unit, trainees should be able to: 1. Perform fitting works. 2. Install mounting bracket/plate. 3. Install ventilation unit. 4. Install equipment wiring system. 5. Install ventilation ducting system. 6. Record installation process. |
Pra-Syarat | 0 |