Job Description (JD)
Nama Program | Pemasangan dan Penyelenggaraan Satu Fasa Penyamanan Udara, Pengudaraan, Pemanasan (HVAC) [F432-007-3:2020] |
---|---|
Kod CU | F432-007-3:2020-C03 |
Competency | Core |
Tajuk CU | Single Phase Air-Conditioning Equipment Installation |
Penerangan CU | Single Phase Air-Conditioning Equipment Installation describes air conditioning equipment such as indoor unit and outdoor unit, to provide consumer usage at home, industry and offices.The person who is competent in this CU should be able to perform fitting works, install mounting bracket/plate, drill piping hole, install piping system, install indoor unit, install outdoor unit, install wiring system, vacuum piping system, perform leak test, charge refrigerant and record air conditioning installation process.The outcomes of this CU are air-conditioning equipment safety, performance and energy efficiency complied with manufacturer’s specifications and Occupational Safety, Health and Environment (OSHE) requirements. |
Tempoh Latihan | 450 |
Objektif Pembelajaran | The learning outcomes of this competency unit are trainees enable to install single phase air-conditioning equipment ensuring equipment safety and performance, in compliance with manufacturer’s and Occupational Safety, Health and Environment (OSHE) requirements. Upon completion of this competency unit, trainees should be able to: 1. Perform fitting works. 2. Install mounting bracket/plate. 3. Drill piping hole. 4. Install piping system 5. Install indoor unit 6. Install outdoor unit. 7. Install wiring system. 8. Vacuum piping system. 9. Perform leak test. 10. Charge refrigerant. 11. Record air conditioning maintenance activities. |
Pra-Syarat | 0 |