Job Description (JD)
Nama Program | Kawalan Operasi Stesen Janaelektrik Arang Batu [D351-002-4:2020] |
---|---|
Kod CU | D351-002-4:2020-C03 |
Competency | Core |
Tajuk CU | Coal-Fired Power Plant Equipment and System Periodic Testing |
Penerangan CU | Coal-Fired Power Plant Equipment and System Periodic Testing describes the competency in carrying out coal-fired power plant equipment scheduled testing, to ascertain the equipment able to function effectively. The person who is competent in this CU should be able to perform BOP equipment periodic testing, perform boiler equipment periodic testing, perform steam turbine equipment periodic testing, perform generator and electrical equipment periodic testing and perform fire protection system equipment periodic testing. The outcome of this CU is coal-fired power plant equipment are periodically tested safely and efficiently based on OEM and station requirements. |
Tempoh Latihan | 160 |
Objektif Pembelajaran | The outcome of this CU is coal-fired power plant equipment are periodically tested safely and efficiently based on OEM and station requirements. Upon completion of this competency unit, trainees should be able to: 1. Perform BOP equipment periodic testing. 2. Perform boiler equipment periodic testing. 3. Perform steam turbine equipment periodic testing. 4. Perform generator and electrical equipment periodic testing. 5. Perform fire protection system equipment testing. |
Pra-Syarat | 0 |