JOB DESCRIPTION

Job Description (JD)

Nama ProgramOperator Penggerekan Paip [F422-002-3:2020]
Kod CUF422-002-3:2020-C04
CompetencyCore
Tajuk CUSurface Settlement Marker Coordination
Penerangan CUSurface Settlement Marker Coordination describes the competency of organising and monitoring on the ground structures and ground condition according to work specifications and regulatory bodies’ requirements. Surface Settlement Marker is used to measure a localised settlement or heave of roads, slopes, embankments, utility pipes and cables.

The person who is competent in this CU should be able to identify surface settlement marker work requirements, determine surface settlement marker, conduct periodical surface settlement marker monitoring and coordinate ERP enforcement.

The outcome of this CU is all on the ground structures and ground condition monitored as to avoid risk associated with ground abnormality as per work specifications and regulatory bodies’ requirements.
Tempoh Latihan60
Objektif PembelajaranThe learning outcomes of this competency are to enable the trainees to monitor all on the ground structures and ground condition as to avoid risk associated with ground abnormality as per work specifications and regulatory bodies’ requirements.
Pra-SyaratNot Available.