Job Description (JD)
Nama Program | Penerap Bata Kanan [F439-005-2:2020] |
---|---|
Kod CU | F439-005-2:2020-C03 |
Competency | Core |
Tajuk CU | TWISTED BRICK PILLAR CONSTRUCTION |
Penerangan CU | Twisted Brick Pillar Construction describes the construction of a column so shaped as to present a twisted or spiral form. The person who is competent in this CU should be able to carry out work area setting out, carry out brick work mortar preparation, carry out twisted brick pillar construction and perform work area housekeeping. The outcome of this CU is twisted brick pillar constructed where the laying method, horizontal alignment, vertical alignment, twisted angle and joint specification are according to drawing and work specification. |
Tempoh Latihan | - |
Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to construct twisted brick pillar where the laying method, horizontal alignment, vertical alignment, twisted angle and joint specification are according to drawing and work specification. Upon completion of this competency unit, trainees should be able to: 1. Carry out work area setting out. 2. Carry out brick work mortar preparation. 3. Carry out twisted brick pillar construction. 4. Perform work area housekeeping. |
Pra-Syarat | Not Available. |