Job Description (JD)
Nama Program | FOMEN PEMBINAAN SYAF PENGGEREKAN PAIP [F422-003-2:2021] |
---|---|
Kod CU | F422-003-2:2021-C01 |
Competency | Core |
Tajuk CU | PIPE JACKING SHEET PILE SHAFT CONSTRUCTION |
Penerangan CU | Pipe Jacking Sheet Pile Shaft Construction describes the competency of erecting the shaft for the purpose of pipe jacking works using sheet pile method in accordance with approved method statement and related regulatory bodies requirements. The person who is competent in this CU should be able to prepare sheet pile shaft construction requirements, perform sheet pile shaft piloting works, prepare sheet pile shaft construction site, construct sheet pile shaft, perform sheet pile shaft maintenance and dismantle sheet pile shaft. The outcome of this CU is pipe jacking shaft built using sheet pile method as per approved method statement and related regulatory bodies requirements. |
Tempoh Latihan | 360 |
Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to build pipe jacking shaft using sheet pile method as per approved method statement and related regulatory bodies requirements. Upon completion of this competency unit, trainees should be able to: 1. Prepare sheet pile shaft construction requirements. 2. Perform sheet pile shaft piloting works. 3. Prepare sheet pile shaft construction site. 4. Construct sheet pile shaft. 5. Perform sheet pile shaft maintenance. 6. Dismantle sheet pile shaft. |
Pra-Syarat | Not Available. |