JOB DESCRIPTION

Job Description (JD)

Nama ProgramPemasangan dan Penyelenggaraan Tiga Fasa Pemanasan, Pengudaraan, Penyamanan Udara dan Penyejukbekuan (HVAC&R) [F432-008-3:2021]
Kod CUF432-008-3:2021-C01
CompetencyCore
Tajuk CUPerform three phase heating equipment installation.
Penerangan CUPerform three phase heating equipment installation describes the competency in performing installation works for heat pump unit to supply hot water to industry in accordance with owner project requirements.

The person who is competent in this CU should be able to carry out three phase heating equipment fitting work, install heating piping system, install three phase heating unit (pump/tank), install three phase heating equipment wiring system, install three phase heating equipment ventilation ducting system, carry out three phase heating equipment testing and record three phase heating equipment installation process.

The outcome of this CU is specified water temperature and energy efficiency obtained, Health, Safety and Environment compliance observed in accordance with manufacture’s specification and authority requirements.
Tempoh Latihan120
Objektif PembelajaranThe learning outcomes of this competency are to enable the trainees to obtain water temperature, and energy efficiency and observe Health, Safety and Environment compliance in accordance with manufacture’s specification and authority requirements.

Upon completion of this competency unit, trainees should be able to:
1. Carry out three phase heating equipment fitting work.
2. Install heating piping system.
3. Install three phase heating unit (pump/tank).
4. Install three phase heating equipment wiring system.
5. Install three phase heating equipment ventilation ducting system.
6. Carry out three phase heating equipment testing.
7. Record three phase heating equipment installation process.
Pra-SyaratNot available.