Job Description (JD)
Nama Program | Pemasangan dan Penyelenggaraan Tiga Fasa Pemanasan, Pengudaraan, Penyamanan Udara dan Penyejukbekuan (HVAC&R) [F432-008-3:2021] |
---|---|
Kod CU | F432-008-3:2021-C02 |
Competency | Core |
Tajuk CU | Perform three phase ventilation equipment installation. |
Penerangan CU | Perform three phase ventilation equipment installation describes the step by step installation of the fan, wiring control and ducting system to remove unwanted air and to supply clean air from the building in accordance with manufacturer’s specification and authority requirements. The person who is competent in this CU should be able to carry out ventilation equipment fitting work, install three phase ventilation mounting bracket plate/ hanging rod, install three phase ventilation unit, install three phase ventilation equipment wiring system, install three phase ventilation equipment ducting system, carry out three phase ventilation equipment testing and record three phase ventilation equipment installation process. The outcome of this CU is specified air flow and energy efficiency obtained, Health, Safety and Environment compliance observed in accordance with manufacture’s specification and authority requirements. |
Tempoh Latihan | 120 |
Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to obtain air flow and energy efficiency and observe Health, Safety and Environment compliance in accordance with manufacture’s specification and authority requirements. Upon completion of this competency unit, trainees should be able to: 1. Carry out ventilation equipment fitting work. 2. Install three phase ventilation mounting bracket plate/ hanging rod. 3. Install three phase ventilation unit. 4. Install three phase ventilation equipment wiring system. 5. Install three phase ventilation equipment ducting system. 6. Carry out three phase ventilation equipment testing. 7. Record three phase ventilation equipment installation process. |
Pra-Syarat | Not available. |