Job Description (JD)
Nama Program | Pemasangan dan Penyelenggaraan Tiga Fasa Pemanasan, Pengudaraan, Penyamanan Udara dan Penyejukbekuan (HVAC&R) [F432-008-3:2021] |
---|---|
Kod CU | F432-008-3:2021-C04 |
Competency | Core |
Tajuk CU | Perform three phase air-conditioning water-cooled equipment installation. |
Penerangan CU | Perform three phase air-conditioning water-cooled equipment installation describes the methodology of installing a three-phase air conditioning water-cooled equipment including power & control wiring system, condensation water drainage system, refrigeration system, fittings & accessories, as well as final touch-up of installation in accordance with manufacture’s specification and authority requirements. The person who is competent in this CU should be able to carry out three phase water-cooled fitting work, install water-cooled mounting bracket plate/ hanging rod, install cooling tower, install air handling unit and chilled water system, install three phase water-cooled packaged unit, install condenser water piping and pump system, install three phase water-cooled equipment wiring system, carry out air-conditioning and refrigeration water-cooled leak test, vacuum piping system, charge water-cooled refrigerant, carry out three phase water-cooled equipment testing and record three phase air-conditioning water-cooled installation process. The outcome of this CU is performance, quality and energy efficiency obtained, Health, Safety and Environment compliance observed in accordance with manufacture’s specification and authority requirements. |
Tempoh Latihan | 480 |
Objektif Pembelajaran | The learning outcomes of this competency are to enable the trainees to obtain quality and energy efficiency and observe Health, Safety and Environment compliance in accordance with manufacture’s specification and authority requirements. Upon completion of this competency unit, trainees should be able to: 1. Carry out three phase water-cooled fitting work. 2. Install water-cooled mounting bracket plate/ hanging rod. 3. Install cooling tower. 4. Install air handling unit and chilled water system. 5. Install three phase water-cooled packaged unit. 6. Install condenser water piping and pump system. 7. Install three phase water-cooled equipment wiring system. 8. Carry out air-conditioning and refrigeration water-cooled leak test. 9. Vacuum piping system. 10. Charge water-cooled refrigerant. 11. Carry out three phase water-cooled equipment testing. 12. Record three phase air-conditioning water-cooled installation process. |
Pra-Syarat | Not available. |